| Place of Origin |
Jiangsu China (Mainland) |
| Brand Name |
haiming |
| Model Number |
ZJ20 |
Operation Procedure 1.Press the start button, the host is electrified, here, the green indicator light, red light is off, the time relay begin to count, the unit is second, the workpiece is heated. 2.Before press the stop button remember the time number, then remove the workpiece, measuring the rise temperature of diameter flat-end service if it is in line with the requirements in order to install. 3.To heat the same specification bearing, to turn the switch in the position of time control, set the heating time, when the bearing is heated to the set time automatically power off. 4.When work is finished, to turn the switch in the position of stop and cut off the power. Technical parametersMODELPOWER(KVA)VOLTAGE(V)CURRENT(A)INSIDE(mm)OUTSIDE(mm)WIDTH(mm)WEIGHT(KG)ZJ20K-I3.83801010--25703065ZJ20K-II5.53801510--40803590ZJ20K-III9.53802510--7010035120ZJ20K-IV11.53803010--9012050200ZJ20K-V223806030--11030050-150250ZJ20K-VI343809030--13045070-170370ZJ20K-VII41.538011030--15060080-180500ZJ20K-VIII6038016010--17080090-200700