| Place of Origin |
Jiangsu China (Mainland) |
| Brand Name |
haiming |
| Model Number |
BGJ |
Operation:1. Take main console link power supply2. Link main consol and disassembly ring with lead3. Opening the power switch, the form of the electric voltage should have designation4. Take the disassembly ring on the bearing5. Regulate the heating time, press start button, begin heating .the main console when the work piece which heating to time need will automatically aloes the power or press the stop switch.6. Take out the disassembly ring after heating end, then unload bearing.Attention:1. The size of the disassemblyring be customization for demand .2. Must use gloves to take out work piece , in order to prevent burn.3. Must close the power , then take out the disassemblyring.